Author :Iflowpower – Portable Power Station Supplier
What is the matter when using the UPS battery usage? 1 Working temperature range is proposed between 21 ¡ã C ~ 27 ¡ã C, the standard value is 25 ¡ã C; 2 different brands, different capacities, different new and old batteries are strictly prohibited; 3 Battery and battery maintain at least 12mm spacing, pay attention to the battery The exhaust gas and ventilation of the system; 4 keep the battery surface clean; 5 Try to load the UPS loaded to discharge the battery depth discharge; 6 If the battery has been placed for a while, the battery should be tested to ensure that the battery can work properly. The key steps for recycling UPS batteries have the following three types: fire method: After the battery is solved, add some reducing reagents, throw it into the furnace, the temperature is generally above 900 ¡ã C. It is divided into no pre-solving kissance, no pre-solving smelting, pre-solving individual smelting technology.
Wet solution: Cut the UPS power supply wants battery, release sulfuric acid, separates plastic shell, rubber shell, plus stone gray precipitated sulfate, dissolve Pb, PBO, electrolysis and precipitate in fluoroboric acid solution. It is also divided into straight-boring method, received by means, non-aggregation. Solid phase electrolysis: Restore the lead mud coated on the cathode for electrolysis, the lead ion is reduced to lead, the anode plate is released, while the alkali liquid is sandwiched.
There are small part of the lead compound in the alkaline solution to be dissolved into HPBO3, and then electrolyze reduction into metal l.