loading

  +86 18988945661             contact@iflowpower.com            +86 18988945661

Analysis of use maintenance and testing of UPS power storage batteries

  Author :Iflowpower – Portable Power Station Supplier

UPS Power Supply Battery Use Maintenance 1. Prohibit the use of sensibility at the UPS output port 2. When using the UPS power battery, strictly abide by the relevant regulations in the product manual or the manual, to ensure the fire line, zero line, and ground In line with the requirements, users must not change their mutual order 3.

Strictly operate according to the correct boot, shut down sequence. When the load suddenly loaded or suddenly loaded, the voltage output of the UPS power battery fluctuated, but the UPS power supply could not work normally 4. It is strictly forbidden to enclose and open the UPS power battery.

Generally requiring at least 6 seconds after closing the UPS power, the UPS power supply may enter the state of the start-up failure, that is, the UPS power supply enters the mainstream output, and no inverter output state 5. Prohibited Overload. The maximum startload load for the UPS power battery is preferably controlled within 80% z, if overloaded, in the inverter, it will often break through the inverse tube 6.

The battery discharge requirements: - UPS is protected by the battery discharge, However, after discharging to the protection shutdown, the battery can return to a certain voltage, but at this time, it will not be able to turn back, otherwise the battery is over-discharge. The UPS can be re-charged to enter the normal use 7. The newly purchased UPS is not to charge the battery before it can be used.

Otherwise, the alternate time is not guaranteed. The UPS should be discharged every 3 to 6 months for long-term power-powered up, and then recharge. In this way, it can extend the life of the battery 9.

The UPS for long-term storage should be used and charged every 3 to 6 months. Otherwise, the UPS incurns and batteries will damage 10. Regularly maintain the UPS power storage battery.

The dust removal, measuring the voltage of the file, check the fan operation and test adjustment UPS system parameters. Replace the UPS power supply as soon as possible. JPG Regularly measure the UPS power battery test 1.

Measure the voltage of the UPS power storage package and the voltage of the unit cell, if the voltage is discovered, the voltage is low, and then solves 2 in time. Every year, the battery pack is activated once, and the battery pack is activated once, and the battery capacity is average 3. The mains power switching device is verified annually, and the power supply and power supply seconds from the line side are taken.

Switch the accuracy of the module action to ensure that the switching action is correct 4. Periodically check all the switching modules of the UPS to disconnect the city electricity, the secondary and secondary power supply from the power supply side, the secondary, the second, bypass power supply is taken, in the inspection switch module Is the switching function is not an accurate operation, and it is also normal to test the inverter function.

GET IN TOUCH WITH Us
recommended articles
Knowledge News About Solar System
no data

iFlowPower is a leading manufacturer of renewable energy.

Contact Us
Floor 13, West Tower of Guomei Smart City, No.33 Juxin Street, Haizhu district, Guangzhou China 

Tel: +86 18988945661
WhatsApp/Messenger: +86 18988945661
Copyright © 2024 iFlowpower - Guangdong iFlowpower Technology Co., Ltd.
Customer service
detect