1) Installer (or engineering team) receives the installed task instruction, prepare relevant information (such as various manufacturers battery installation, record table, etc.) and full installation tools (including the multimeter, etc.), implement the schedule and engineering schedule, etc.
2) The installer (or engineering team) should bring a small amount of system spare parts (such as screws, etc.) to install the installation location, achieve a detailed installation project schedule, discuss the details of the engineering details (such as installation methods, load-bearing, etc.); 3) start installation Before the project, the installation personnel (or engineering team) should be organized, parse the precautions in the installation process and the use of battery usage and maintenance precautions, must pay attention to safety during installation; 4) Installation person (or engineering team) for battery The list of outlets and accessories, the box will be signed and retracted, the battery installation system map, the installation instruction manual, etc.
5) Check if the storage position of the battery in the computer room is reasonable according to the construction drawing, whether the maintenance space is reserved, whether the heat source and where the spark may have maintained a distance of 0.5 meters or not, whether the insurance box, etc. Place under the air conditioner, if it does not meet, please ask if the communication company's engineering department is modified, and if you have a memo; 6) Unpacking the system map of the battery, should be installed in strict accordance with the battery map of the battery.
No systematic installation of any system components (including the batches of the battery cell number), all system pieces (spare parts) should be completely consistent with the model specification specified in the installation map; 7) Install. Because the battery has been charged, pay attention to prevent short circuits, all installation tools should be wrapped in insulating tape; 8) Wipe the battery pole column and the dust on the shell and steel frame before installing the connecting strip, especially to ensure pole Clean dust on the column. Single numbers should be pushed; 9) Check all screws to tighten each screw after installation.
To specify a special person check, the person is responsible, make sure all screws are tightened; 10) After the installation check is completed, measure and record the open voltage and battery pack of all battery cells, and fill in the installation statistics table (or other similar mounting surface);.