Early failure of the UPS battery is 1. Early failure of the UPS battery means that the battery pack is in the process of use, but only a few months or 1 year, and the performance of individual batteries has a sharp deterioration, and the capacity is below the rated value of 80%, resulting in Early failure of the UPS battery is the same as the electrolytic solution in the battery and the electrolyte in the AGM partition. 2, UPS battery performance life long depends on the material, industrial environment, active material purity combination and use environment and maintenance, etc.

3, the UPS battery that appears in a set of UPS batteries is generally caused by individual accidental factors in the processing, such as in the welding pole group, there is a small lead particles fall into the pole group, and the amount of acid is controlled. Strict, unqualified parts are loaded, some raw materials are unsuitable, etc. UPS Battery Failure News (1) Clean all the battery top; (2) Classify the battery according to the same brand, the same model classification; (3) Take the appearance, corrosion, or the full provision of the leakage, this part Not repaired; (4) According to the even sequence, it is conducive to connecting the positive and negative poles; (5) connect the battery with a connecting strip; (6) Connect the charger to the positive and negative poles; (7) Charging an hour, test After the UPS battery is discharged, the test is not a short-circuit circuit condition; (8) When the repair condition is reached, the discharge system is connected according to the requirements; (9) Adjust the standard data of the discharge system, so that the standard data of the battery; (10) When the discharge is started, the deionized water is added to 1: 1, and 10% of the regenerative agent is added, and the charge is charged for 16 hours and then discharges the circulation.

CONTACT US
Just tell us your requirements, we can do more than you can imagine.
Send your inquiry
Chat with Us

Send your inquiry

Choose a different language
English
العربية
Deutsch
Español
français
italiano
日本語
한국어
Português
русский
简体中文
繁體中文
Afrikaans
አማርኛ
Azərbaycan
Беларуская
български
বাংলা
Bosanski
Català
Sugbuanon
Corsu
čeština
Cymraeg
dansk
Ελληνικά
Esperanto
Eesti
Euskara
فارسی
Suomi
Frysk
Gaeilgenah
Gàidhlig
Galego
ગુજરાતી
Hausa
Ōlelo Hawaiʻi
हिन्दी
Hmong
Hrvatski
Kreyòl ayisyen
Magyar
հայերեն
bahasa Indonesia
Igbo
Íslenska
עִברִית
Basa Jawa
ქართველი
Қазақ Тілі
ខ្មែរ
ಕನ್ನಡ
Kurdî (Kurmancî)
Кыргызча
Latin
Lëtzebuergesch
ລາວ
lietuvių
latviešu valoda‎
Malagasy
Maori
Македонски
മലയാളം
Монгол
मराठी
Bahasa Melayu
Maltese
ဗမာ
नेपाली
Nederlands
norsk
Chicheŵa
ਪੰਜਾਬੀ
Polski
پښتو
Română
سنڌي
සිංහල
Slovenčina
Slovenščina
Faasamoa
Shona
Af Soomaali
Shqip
Српски
Sesotho
Sundanese
svenska
Kiswahili
தமிழ்
తెలుగు
Точики
ภาษาไทย
Pilipino
Türkçe
Українська
اردو
O'zbek
Tiếng Việt
Xhosa
יידיש
èdè Yorùbá
Zulu
Current language:English