Can the Processant Responsibility Extension Can End the battery recovery?

2022/04/08

  Author :Iflowpower – Portable Power Station Supplier

Recently, the Ministry of Industry and Technology Department of Industry and Information Technology is proposed in the "Main point of industrial energy saving and comprehensive utilization work in 2018" to promote the second batch of electrical electronic product processing. In the first batch of pilot list, all three battery companies are all battery processing companies [Fengsita Co., Ltd.

, Chaowei Power Co., Ltd. and Tianneng Group (Henan) Energy Technology Co.

, Ltd.]. Therefore, from the recovery status of the battery, the landing situation of the controller's responsibility extension policy in the category of the battery.

The battery has a large development space, but the growth and development of the battery industry is not to completely deal with lead recovery. In general, the waste battery contains 74% lead plate, 20% sulfuric acid and 6% of plastic, so the waste battery recovery is high. Companies with more advanced domestic equipment, more mature process, the reuse rate of the battery can reach more than 98%.

Phase related lithium-ion batteries, my country's battery recovery technology is very mature. The problem is that the waste battery recovery is mainly based on individual traders, and the waste battery flows to illegally small smelting workshops. The entire recycling system is inadvertent state.

Only formal battery recycling companies build their own recycling network, master the initiative of recycling, and domestic battery recycling is likely to contain, and the processed responsibility extension system can also be effectively implemented. Chaowei Group uses 300,000 battery sales terminals across the country, which has started reverse recycling of scrapped battery channels and platforms in more than 10 provinces and cities, including Beijing, Tianjin, Shandong. At the same time, through cooperation with other companies, improve the battery recycling industry chain.

In May 2016, Super Wei and Hubei Jinyang Company signed a cooperative framework agreement to jointly promote battery standard recycling and regenerative lead cycle use of lead circulation; May 28, 2017, Super Wei and Shanghai Xinyun Gui Dariel Metal Regeneration Co., Ltd., Shanghai Color network signing, jointly built the battery recycling model in Shanghai, promoting the construction of battery recycling system in the region.

This not only marks the formal formation of the construction of the waste of the waste battery recycling network, but also marks a need for a long step forward. Representative of the National People's Congress, my country's Power General Manager Liu Baosheng has submitted a bill, proposed based on the Internet of Things technology, constructing a lead-acid battery resource circulating system. In order to promote the green development of the battery industry, the company has established a special battery recycling team for many years ago, in recent years, hundreds of millions of yuan is used to replace environmental equipment.

The company relies on dozens of sales companies in the country, nearly 10,000 dealers, build a three-dimensional battery recycling network. In addition, the company also promotes the old-new business, in these outlets, consumers can deduct part of the new battery with waste lead-acid batteries. Tianneng Group built a waste battery disposal plant in Changxing and Henan Fuyang, further improving the "battery manufacturing - recycling - manufacturing" green industrial chain closed loop.

It is understood that the total investment of 300,000 tons of waste battery cleaning and regeneration technology renovation project is 300 million yuan, and the annual output value is expected to reach 3 billion yuan. Battery recycling chaos is difficult to end in a short period of time, and the implementation of the processed responsibility extension system must also participate in the company. In the future, the processors of the battery and other industries should also start from the full life cycle of the product, considering the resource environment responsibility of the processor needs.

CONTACT US
Just tell us your requirements, we can do more than you can imagine.
Send your inquiry
Chat with Us

Send your inquiry

Choose a different language
English
العربية
Deutsch
Español
français
italiano
日本語
한국어
Português
русский
简体中文
繁體中文
Afrikaans
አማርኛ
Azərbaycan
Беларуская
български
বাংলা
Bosanski
Català
Sugbuanon
Corsu
čeština
Cymraeg
dansk
Ελληνικά
Esperanto
Eesti
Euskara
فارسی
Suomi
Frysk
Gaeilgenah
Gàidhlig
Galego
ગુજરાતી
Hausa
Ōlelo Hawaiʻi
हिन्दी
Hmong
Hrvatski
Kreyòl ayisyen
Magyar
հայերեն
bahasa Indonesia
Igbo
Íslenska
עִברִית
Basa Jawa
ქართველი
Қазақ Тілі
ខ្មែរ
ಕನ್ನಡ
Kurdî (Kurmancî)
Кыргызча
Latin
Lëtzebuergesch
ລາວ
lietuvių
latviešu valoda‎
Malagasy
Maori
Македонски
മലയാളം
Монгол
मराठी
Bahasa Melayu
Maltese
ဗမာ
नेपाली
Nederlands
norsk
Chicheŵa
ਪੰਜਾਬੀ
Polski
پښتو
Română
سنڌي
සිංහල
Slovenčina
Slovenščina
Faasamoa
Shona
Af Soomaali
Shqip
Српски
Sesotho
Sundanese
svenska
Kiswahili
தமிழ்
తెలుగు
Точики
ภาษาไทย
Pilipino
Türkçe
Українська
اردو
O'zbek
Tiếng Việt
Xhosa
יידיש
èdè Yorùbá
Zulu
Current language:English